KDR

report(s) found: 2
Center: Petroleum Research Center x

Project title: Assessment and Control of Parameters for the Minagish Water Injection System (Western Kuwait) x

Assessment and control of parameters for the Minagish water injection system (western Kuwait)

2013

KISR Report

Technical Report No. 4

Contributor(s):  Abdullah, Abdulmajeed.

Subject(s):  Water ,  Water ,  Plant ,  Plant ,  Temperature ,  Temperature ,  Key Words: Effluent Water. ,  Suspended Solids. ,  Becteria. ,  Monitoring Program. ,  مياة متخلفة عن عمليات الانتاج ,  عوائق صلبة ,  بكتيريا ,  برنامج مراقبة

Project(s):  Assessment and Control of Parameters for the Minagish Water Injection System (Western Kuwait)

Project code:  PP 065S

View document

Assessment and control of parameters for the minagish water injection system (Western Kuwait)

2013

KISR Report

Technical Report No. 5

Contributor(s):  AL Bazzazz, Waleed.

Subject(s):  Water ,  Water ,  Plants ,  Plants ,  Effuent Water. ,  Aquifer Water. ,  Suspended Solids. ,  Bacteria. ,  Monitoring Program. ,  مياه مصاحبة لعمليات الانتاج ,  مياه جوفيه ,  عوالق صلبة ,  عوالق صلبة ,  بكتيريا ,  برنامج مراقبة

Project(s):  Assessment and Control of Parameters for the Minagish Water Injection System (Western Kuwait)

Project code:  PP065S

View document