KISR Report
Interim Report No. 28.
Contributor(s): Alimam, A. A.
Subject(s): Installation cost. Replacement cost. Service life. Failur rates. Life cycle costing.
Project(s): Comparative Evaluation of Pipe Material
Project code: SPP 1