KISR Report
Technical Report
Contributor(s): Elimam, A. A.
Subject(s): Makespan. Scheduling. Branch and bound. Multiple machines.
Project(s): The Multiple Machine Makespan Problem :A Branch and Bound Approach
Project code: TE GEN