KDR

report(s) found: 4
Center: Water Resources Division x

Project title: Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project in Kuwait x

Study, design and construction supervision of a pilot groundwater drainage project

2000

KISR Report

Final Report

Subject(s):  Leaching-settlement experiments. ,  Modified oedometer cells. ,  Geochemical model. ,  Mineralogical investigations.

Project(s):  Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project in Kuwait

Project code:  WH 001

View document

Studey, desighn and construction supervision of pilot groundwater drainage project, long-term operation, monitoring and assessment of the drainage system at Shamiyah and Kaifan Part 2:

2000

KISR Report

Final Report

Contributor(s):  Sherif, Mohammad.

Subject(s):  Groundwater ,  Groundwater ,  Water disposal in the ground ,  Water disposal in the ground

Project(s):  Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project in Kuwait

Project code:  WH 001

View document

Study, design and construction supervision of a pilot groundwater drainage project, Phase III

1997

KISR Report

Amendment / Extension "G"

Contributor(s):  Kuwait Institute for Scientific Research.

Subject(s):  Groundwater. Drainage. Operation. Monitoring. Data. Mathematical modelling.

Project(s):  Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project in Kuwait

Project code:  WH 001

View document

Study, design and construction supervision of a groundwater piolt drainage project in Kuwait

1994

KISR Report

Amendment / Extension "C"

Contributor(s):  Mossaad, M.

Subject(s):  Subsurface water rise. water table. Drainage. Geotechnical impact.

Project(s):  Study, Design and Construction Supervision of a Pilot Groundwater Drainage Project in Kuwait

Project code:  WH 001

View document