KDR

report(s) found: 10091

Safety requirements in oil -fired steam boiler istallations. Appendix Vl

1988

KISR Report

Final Report

Contributor(s):  Engineering Division.

Subject(s):  Oil-fired steam boilers. Safety and control instruments.. Electrical installation.

Project(s):  Safety Requirements in Electric Steam Boiler Istallations

Project code:  SE 63

View document

Safety requirements in electric steam boiler istallations. Appendix Vll

1988

KISR Report

Final Report

Contributor(s):  Engineering Division.

Subject(s):  Electric steam boilers. Safety and control instruments.. Electrical installation.

Project(s):  Safety Requirements in Electric Steam Boiler Istallations

Project code:  SE 63

View document

Development of fresh water production system for desert areas

1986

KISR Report

Proposal

Contributor(s):  Al-Homoud, A. A.

Subject(s):  Solar desalination. Solar ponds. MSF desalination. Environmental impact of desalination system.

Project(s):  Development of Fresh Water Production System for Desert Areas

Project code:  SE 64

View document

Effects of Design Factors on Temperature Profile of Partially Charged Thermal Storage Tanks

1986

KISR Report

Technical Report

Contributor(s):  Moustafa, S.

Subject(s):  Solar thermal storage. Thermal stratification.

Project(s):  Effects of Design Factors on Temperature Profile of Partially Charged Thermal Storage Tanks

Project code:  SE GEN

View document

Comparative Performance of Stationary and Tracking Photovoltaic Modules

1986

KISR Report

Technical Report

Contributor(s):  Al-Busairi, H.

Subject(s):  Photovoltaic. 2-axis tracking. Fixed title. PV module performance.

Project(s):  Comparative Performance of Stationary and Tracking Photovoltaic Modules

Project code:  SE GEN

View document

Weather station:

1983

KISR Report

Technical Report

Contributor(s):  Rassas, M.

Subject(s):  Total tradition. Diffuse radiation. Direct radiation. Hour of sunshine. Wind speed and direction. Temperature. Relative humidity.

Project(s):  Weather Station, Weather Data for 1978-82

Project code:  SE GEN

View document

Flat plate collectors : Preliminary test results and analysis

1983

KISR Report

Intrim Report

Contributor(s):  Maheshwari, G. P.

Subject(s):  Domestic solar water heaters. Global insolation. Daily energy collection. System efficiency.

Project(s):  Flat Plate Collectors

Project code:  SE GEN

View document

Comprehensive diagnosis. Phase ll, Jan. 1, 1982 - June 30, 1982

1982

KISR Report

Progress Report No. 2

Contributor(s):  Elmaghraby, S. E.

Subject(s):  Acbestos/cement pipe. Cement leaching. Sulphate attack on asb/cem pipes.

Project(s):  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

Project code:  SPP 1

View document

Corrosion Studies Related to Sewage

1982

KISR Report

Proposal

Contributor(s):  Islam, M.

Subject(s):  Asbestos/cement pipes. Sewer atmospher corrosion. Coating.

Project(s):  Corrosion Studies Related to Sewage

Project code:  SPP 1

View document

Plant observation. Task P1

1982

KISR Report

Progress Report No. 6

Contributor(s):  Lalwani, S.

Subject(s):  Asbestos/cement pipes. Producing plants.

Project(s):  Development and Improvement of Asbestos-Cement Pipe Performance in Kuwait

Project code:  SPP 1

View document

Analysis of the thickness of ABS/CEM pipes. Task P1

1982

KISR Report

Proposal

Contributor(s):  Elimam, A. A.

Subject(s):  Pipe thickness. Variability. ISO specification.

Project(s):  Analysis of the Thickness of Asb/Cem Pipe

Project code:  SPP 1

View document

The Effect of Corners on the Heat Flow Through Insulated Walls

1986

KISR Report

Technical Report

Contributor(s):  Aasem, I. O.

Subject(s):  Heat flow. Temperature disturbance. Steady-state temperature analysis.

Project(s):  The Effect of Corners on the Heat Flow Through Insulated Walls

Project code:  SE GEN

View document