KDR

report(s) found: 10000

Investigation and selection of marine and industrial paints for application in the Shuaiba Area

1990

KISR Report

Final Report

Contributor(s):  Carew, John.

Subject(s):  Coating durability. Industrial atmosphere. Marine environment. Field exposure tests. Accelerated laboratory tests. Electrochemical tests.

Project(s):  Investigation and Selection of Marine and Industrial Paints for Application in the Shuaiba Area

Project code:  MS 59

View document

Analysis notching test results. Task P3

1982

KISR Report

Proposal No. 13

Contributor(s):  Lalwani, S.

Subject(s):  Asbestos/cement pipes. Notch sensitivity.

Project(s):  Analysis Notching Test Results

Project code:  SPP 1

View document

Water Desalination by reverse osmosis. Phase II

1986

KISR Report

Proposal Report

Contributor(s):  Abdel-Jawad, M.

Subject(s):  Reverse osmosis. Long term operation.

Project(s):  Water Desalination by Reverse Osmosis. Phase II

Project code:  MS 60

View document

Notes on some installation practices for asbestos/cement pipes in Kuwait

1982

KISR Report

Progress Report No. 19

Contributor(s):  Matti, M.

Subject(s):  Asbestos/Cement pipe. Installation practices. Handling. Stacking. Hydrostatic testing and specification.

Project(s):  Note on Some Intallation Practices for Asbestos/Cement Pipes in Kuwait

Project code:  SPP 1

View document

H-oil process and catalyst evaluation and development

1993

KISR Report

Final Report

Contributor(s):  Absi Halabi, Mamun.

Subject(s):  H-oil process. Petroleum residues. Hydrotreatment. Hydroprocessing. Hydroconversion. Catalysts.

Project(s):  H-oil Process and Catalyst Evaluation and Development

Project code:  Pet 47

View document

FCC catalyst performance evaluation test using microactivity testing unit

1987

KISR Report

Proposal

Contributor(s):  Diab, S. Y.

Subject(s):  FCC. MAT. Performance. Catalyst. Evaluation.

Project(s):  FCC Catalyst Performance Evaluation Test Using Microactivity Testing Unit

Project code:  Pet 50

View document

Significant plant parameters. Task P1

1982

KISR Report

Technical Report No. 4

Contributor(s):  Elimam, A. A.

Subject(s):  Correlation. Signaficant plant parameters. Variability. Control charts.

Project(s):  Significant Plant Parameters

Project code:  SPP 1

View document

FCC catalyst performance evaluation test using microactivity testing unit

1988

KISR Report

Final Report

Contributor(s):  Diab, S. Y.

Subject(s):  MAT. Zeolite.

Project(s):  FCC Catalyst Performance Evaluation Test Using Microactivity Testing Unit

Project code:  Pet 50

View document

Quality control windows on plant operations. Task P2

1982

KISR Report

Technical Report No. 11

Contributor(s):  Elimam, A. A.

Subject(s):  Quality control. Recording. Corrective actions. Statistical analysis.

Project(s):  Quality Control Windows on Plant Operations

Project code:  SPP 1

View document

Petroleum evaluation facilities quality control system

1987

KISR Report

Technical Report

Contributor(s):  Khan, Z. H.

Subject(s):  Quality assurance. Standard reference materials. Calibration.

Project(s):  Petroleum Evaluation Facilities Quality Control System

Project code:  PET GEN

View document

Laboratory Studies, causes of cracks and color variations and recommendations for repair

1984

KISR Report

Technical Report

Contributor(s):  Gouda, G. R.

Subject(s):  Concrete Core. Analysis: dark and light concrete. Evaluation. Microstructure. Causes of color variation. Recommendations.

Project(s):  Evaluation of Concrete Structures

Project code:  RFS 90

View document

Non-destructive analysis of heavy crude oil by gel permeation chromatography, (key decision point report A)

1984

KISR Report

Interim Report No. 2

Contributor(s):  Khan, Z. H.

Subject(s):  Separation. Crude oil. Gel permeation chromatography analysis.

Project(s):  Non-Destructive Analysis of Heavy Crude Oil By Gel Permeation Chromatography

Project code:  PET 19

View document