KDR

report(s) found: 10091

Bathymetric survey of the Shuaiba Offshore Area

1977

KISR Report

Technical Report

Contributor(s):  Al-Kazily, M. F.

Subject(s):  Bathymetric survey. Shuaiba Area Authority.

Project(s):  Bathymetric Survey of the Shuaiba Offshore Area

Project code:  EES 00 KISR

View document

Pre-season shrimp recruitment surveys in Saudi Arabia

1987

KISR Report

Final Report

Contributor(s):  Morgan, G. R.

Subject(s):  Open season. Catch. Landings.

Project(s):  Pre-Season Shrimp Recruitment Surveys in Saudi Arabia

Project code:  RFS 130

View document

Investigation of the corrosion problems associated with the seawater line at Kuwait shipbuilding and repairyard company

1982

KISR Report

Draft Preproposal

Contributor(s):  Islam, M.

Subject(s):  Corrosion. Seawater line. Fouling.

Project(s):  Investigation of the Corrosion Problems Associated with the Seawater Line at Kuwait Shipbuilding and Repairyard Company

Project code:  RFS 23

View document

Salt and chlorine plant effluents and the effect of mercury on the nearby aqueous and sedimentary marine environments of Kuwait

1977

KISR Report

Technical Report

Contributor(s):  Szucs, F. K.

Subject(s):  Salt. Chlorine. Mercury. Sedimentary marine environment. Kuwait.

Project(s):  Salt & Chlorine Plant Effluents & the Effect of Mercury on the Nearby Aqueous & Sedimentary Marine Environments of Kuwait

Project code:  EES 00

View document

Investigation of the corrosion problems associated with the seawater line at Kuwait shipbuilding and repairyard company

1982

KISR Report

Technical Report

Contributor(s):  Abu-Safiah, A.

Subject(s):  Corrosion. Seawater line. Fouling.

Project(s):  Investigation of the Corrosion Problems Associated with the Seawater Line at Kuwait Shipbuilding and Repairyard Company

Project code:  RFS 23

View document

Analysis of ASB/CEM plant manufacturing experiments

1983

KISR Report

Interim Report No. 33

Contributor(s):  Lalwani, S.

Subject(s):  Mix design. Cobra mill opening. Pipe formation.

Project(s):  Development and Improvement of Asbestos/Cement Pipe Performance in Kuwait

Project code:  SPP 1

View document

Performance of wall construction in Kuwait

1997

KISR Report

Final Report

Contributor(s):  Al-Mudhaf, H.

Subject(s):  Nonperformance. ,  Masonry units. ,  Mortars. ,  Concrete blocks.

Project(s):  Performance of Wall Construction in Kuwait

Project code:  BM 30

View document

Subsurface water rise in residential areas of Kuwait

1983

KISR Report

Final Report

Contributor(s):  Youash, Y. Y.

Subject(s):  Subsurface water rise. Geology. Geophysics. Hydrology. Drilling. Logging. Water and soil study. Mathematical simulation.

Project(s):  Study of Subsurface Water Rise in the Residential Area of Kuwait

Project code:  EES 56

View document

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area (ESIA)

1982

KISR Report

Proposal

Contributor(s):  Environmental and Earth Sciences Division.

Subject(s):  Wastewater collection. Sanitary wastes. Wastewater treatment. Separate treatment. Combined treatment. Wastewater management program.

Project(s):  Feasibility Study of Sanitary Waste Treatment System for the Enlarged Shuaiba Industrial Area (ESIA)

Project code:  SPP 3

View document

Laboratory testing of some sand and gravel samples :

1987

KISR Report

Technical Report No. 5

Contributor(s):  Al-Sulaimi, J.

Subject(s):  Laboratory tests. Quality. Grading. Soundness test. Chloride and sulphate determination.

Project(s):  Assesment of the Sand and Gravel Resources of Kuwait

Project code:  EES 67

View document

KISR landscape master plan

1986

KISR Report

Proposal

Contributor(s):  Taha, F. K.

Subject(s):  KISR master plan. Landscap design. Ornamental plants. KISR landscape area uses.

Project(s):  KISR landscape master plan

Project code:  RFS 134

View document

Delamination of coal tar epoxy mastic paint on steel pilings

1985

KISR Report

Technical Report

Contributor(s):  Carew, John.

Subject(s):  Peeling of marine paint. Coal tar epoxy mastic paint. Steel pilings. Water permeability. Salt spray fog test. Degree of cure. Bond test. Coating defects.

Project(s):  Delamination of Coal tar Epoxy Mastic Paint on Steel Pilings

Project code:  RFS 121

View document