عدد النتائج: 10091

Bathymetric survey of the Shuaiba Offshore Area

1977

KISR Report

Technical Report

المساهمون:  Al-Kazily, M. F.

الموضوعات:  Bathymetric survey. Shuaiba Area Authority.

المشروعات:  Bathymetric Survey of the Shuaiba Offshore Area

رمز المشروع:  EES 00 KISR

عرض الملف

Pre-season shrimp recruitment surveys in Saudi Arabia

1987

KISR Report

Final Report

المساهمون:  Morgan, G. R.

الموضوعات:  Open season. Catch. Landings.

المشروعات:  Pre-Season Shrimp Recruitment Surveys in Saudi Arabia

رمز المشروع:  RFS 130

عرض الملف

Investigation of the corrosion problems associated with the seawater line at Kuwait shipbuilding and repairyard company

1982

KISR Report

Draft Preproposal

المساهمون:  Islam, M.

الموضوعات:  Corrosion. Seawater line. Fouling.

المشروعات:  Investigation of the Corrosion Problems Associated with the Seawater Line at Kuwait Shipbuilding and Repairyard Company

رمز المشروع:  RFS 23

عرض الملف

Salt and chlorine plant effluents and the effect of mercury on the nearby aqueous and sedimentary marine environments of Kuwait

1977

KISR Report

Technical Report

المساهمون:  Szucs, F. K.

الموضوعات:  Salt. Chlorine. Mercury. Sedimentary marine environment. Kuwait.

المشروعات:  Salt & Chlorine Plant Effluents & the Effect of Mercury on the Nearby Aqueous & Sedimentary Marine Environments of Kuwait

رمز المشروع:  EES 00

عرض الملف

Investigation of the corrosion problems associated with the seawater line at Kuwait shipbuilding and repairyard company

1982

KISR Report

Technical Report

المساهمون:  Abu-Safiah, A.

الموضوعات:  Corrosion. Seawater line. Fouling.

المشروعات:  Investigation of the Corrosion Problems Associated with the Seawater Line at Kuwait Shipbuilding and Repairyard Company

رمز المشروع:  RFS 23

عرض الملف

Analysis of ASB/CEM plant manufacturing experiments

1983

KISR Report

Interim Report No. 33

المساهمون:  Lalwani, S.

الموضوعات:  Mix design. Cobra mill opening. Pipe formation.

المشروعات:  Development and Improvement of Asbestos/Cement Pipe Performance in Kuwait

رمز المشروع:  SPP 1

عرض الملف

Performance of wall construction in Kuwait

1997

KISR Report

Final Report

المساهمون:  Al-Mudhaf, H.

الموضوعات:  Nonperformance. ,  Masonry units. ,  Mortars. ,  Concrete blocks.

المشروعات:  Performance of Wall Construction in Kuwait

رمز المشروع:  BM 30

عرض الملف

Subsurface water rise in residential areas of Kuwait

1983

KISR Report

Final Report

المساهمون:  Youash, Y. Y.

الموضوعات:  Subsurface water rise. Geology. Geophysics. Hydrology. Drilling. Logging. Water and soil study. Mathematical simulation.

المشروعات:  Study of Subsurface Water Rise in the Residential Area of Kuwait

رمز المشروع:  EES 56

عرض الملف

Feasibility study of sanitary waste treatment system for the enlarged Shuaiba Industrial Area (ESIA)

1982

KISR Report

Proposal

المساهمون:  Environmental and Earth Sciences Division.

الموضوعات:  Wastewater collection. Sanitary wastes. Wastewater treatment. Separate treatment. Combined treatment. Wastewater management program.

المشروعات:  Feasibility Study of Sanitary Waste Treatment System for the Enlarged Shuaiba Industrial Area (ESIA)

رمز المشروع:  SPP 3

عرض الملف

Laboratory testing of some sand and gravel samples :

1987

KISR Report

Technical Report No. 5

المساهمون:  Al-Sulaimi, J.

الموضوعات:  Laboratory tests. Quality. Grading. Soundness test. Chloride and sulphate determination.

المشروعات:  Assesment of the Sand and Gravel Resources of Kuwait

رمز المشروع:  EES 67

عرض الملف

KISR landscape master plan

1986

KISR Report

Proposal

المساهمون:  Taha, F. K.

الموضوعات:  KISR master plan. Landscap design. Ornamental plants. KISR landscape area uses.

المشروعات:  KISR landscape master plan

رمز المشروع:  RFS 134

عرض الملف

Delamination of coal tar epoxy mastic paint on steel pilings

1985

KISR Report

Technical Report

المساهمون:  Carew, John.

الموضوعات:  Peeling of marine paint. Coal tar epoxy mastic paint. Steel pilings. Water permeability. Salt spray fog test. Degree of cure. Bond test. Coating defects.

المشروعات:  Delamination of Coal tar Epoxy Mastic Paint on Steel Pilings

رمز المشروع:  RFS 121

عرض الملف