KDR

report(s) found: 10100

Design of solar cooling system for a primary school

1984

KISR Report

Final Report

Contributor(s):  Suri, R. K.

Subject(s):  Cooling load. Solar absorption cooling system.

Project(s):  Design of Solar Cooling System for a Primary School

Project code:  SE 53

View document

Design of solar cooling system for a primary school

1983

KISR Report

Proposal

Contributor(s):  Suri, R. K.

Subject(s):  Cooling load. Solar absorption cooling system.

Project(s):  Design of Solar Cooling System for a Primary School

Project code:  SE 53

View document

Failure analysis of ruptured boiler tubes from KNPC Mina Al-Ahmadi Refinery

1986

KISR Report

Technical Report

Contributor(s):  Islam, M.

Subject(s):  Boiler failure. Overheat rupture. Hydrogen damage.

Project(s):  Failure Analysis of Ruptured Boiler Tubes from KNPC Mina Al-Ahmadi Refinery

Project code:  RFS 149

View document

Analysis of 4" vent pipe materials

1986

KISR Report

Technical Report

Contributor(s):  Riad, W.

Subject(s):  Vent pipe. Perforation. Pipe material analysis.

Project(s):  Analysis of 4" Vent Pipe Materials

Project code:  RFS 151

View document

Investigation of corroded power cable and testing of thickness / uniformity of galvanized sheet

1986

KISR Report

Technical Report

Contributor(s):  Islam, M.

Subject(s):  Localized corrosion. Corroded power cable. Galvanized steel.

Project(s):  Investigation of Corroded Power Cable and Testing of Thickness / Uniformity of Galvanized Sheet

Project code:  RFS 152

View document

Cooling storage assessment for Kuwait

1984

KISR Report

Proposal

Contributor(s):  Suri, R. K.

Subject(s):  Cooling Storage. Energy management. Peak load. Saving of utilities.

Project(s):  Cooling Storage Assessment for Kuwait

Project code:  SE 54

View document

Cool storage assessment study in Kuwait

1985

KISR Report

Final Report

Contributor(s):  Suri, R. K.

Subject(s):  Cool storage. Peak power shaving. Unit cooling cost.

Project(s):  Cool Storage Assessment Study in Kuwait

Project code:  SE 54

View document

Solar cooling of a school

1983

KISR Report

Final Report

Contributor(s):  Suri, R. K.

Subject(s):  Absorption cooling. Solar cooling. Litchium bromide absorption chiller.

Project(s):  Solar Cooling of a School

Project code:  SE 7 KISR

View document

Assessment of turbidity at Shuaiba offshore seawater intakes due to dredging the KNPC pipeline trench

1986

KISR Report

Special Technical Report

Contributor(s):  Lo, J. M.

Subject(s):  Bredging. Sediment transport. Bed load. Suspended load. Wave and current interaction.

Project(s):  Assessment of Turbidity at Shuaiba Offshore Seawater Intakes Due to Dredging the KNPC Pipeline Trench

Project code:  RFS 126

View document

Bathymetric survey of the Shuaiba Offshore Area

1977

KISR Report

Technical Report

Contributor(s):  Al-Kazily, M. F.

Subject(s):  Bathymetric survey. Shuaiba Area Authority.

Project(s):  Bathymetric Survey of the Shuaiba Offshore Area

Project code:  EES 00 KISR

View document

Pre-season shrimp recruitment surveys in Saudi Arabia

1987

KISR Report

Final Report

Contributor(s):  Morgan, G. R.

Subject(s):  Open season. Catch. Landings.

Project(s):  Pre-Season Shrimp Recruitment Surveys in Saudi Arabia

Project code:  RFS 130

View document

Investigation of the corrosion problems associated with the seawater line at Kuwait shipbuilding and repairyard company

1982

KISR Report

Draft Preproposal

Contributor(s):  Islam, M.

Subject(s):  Corrosion. Seawater line. Fouling.

Project(s):  Investigation of the Corrosion Problems Associated with the Seawater Line at Kuwait Shipbuilding and Repairyard Company

Project code:  RFS 23

View document