Technology assessment lead acid battery design

1981

KISR Report

Intrim Report

Contributor(s):  Khraishi, N.

Subject(s):  Sli lead acid battery. Battery container. Posts and connectors. Separators. Grid materials. Paste. Weight analysis. Electrochemistry.

Project(s):  Battey plant visits for the period August 6, 1981-September 21, 1981

Project code:  TE 49

View document

Assessment of indoor organic pollutant levels in selected schools

2011

KISR Report

Progress Report No. 3

Contributor(s):  Al Awadi, Layla.

Subject(s):  Indoor air pollution ,  Air quality management ,  Climate Change ,  Indoor air pollution ,  Air quality management ,  Climate Change ,  Indoor air quality ,  questionnaire forms ,  VOCs ,  PAH ,  PBDEs ,  مركبات المثبطة للحريق ,  المركبات الاروماتية متعددة الحلقات ,  المركبات الهيدروكربونية المتطايرة ,  نموذج الاستبيان ,  جودة هواء داخلي

Project(s):  Assessment of Indoor Organic Pollutant Levels in Selected Schools

Project code:  EC 045C

View document

Testing, evaluation, and post-certification activities for radionuclide station, RN-40, Kuwait City, Kuwait

2019

KISR Report

Technical Report

Contributor(s):  Al Dabbous, A. N.

Subject(s):  Nuclear power plant ,  Nuclear power plant ,  Maintenance and repair ,  Maintenance and repair ,  منظمة الحظر الشامل للتجارب النووية ,  رصد النويدات المشعة ,  الصيانة ,  Comprehensive nuclear test ban treaty organization ,  Continuous monitoring system ,  manitenence activities

Project(s):  Testing, Evaluation, & Post-Certification Activities for Radionuclide Station, RN-40, Kuwait City, Kuwait

Project code:  EC 032S

View document

A Plan for energy conservation and management of electricity demand for the state of Kuwait.

2004

KISR Report

Final Report

Contributor(s):  Al Enezi, Mahammed.

Subject(s):  Electricity consumption patterns. ,  Tariff/Non-tariff factors. ,  Demand management. ,  Projections.

Project(s):  A Plan for Energy Conservation and Management of Electricity Demand for the State of Kuwait

Project code:  TE 035C

View document

Long term prediction of winds for Kuwait.

2007

KISR Report

Final Report

Contributor(s):  Neelamani, Subramaniam.

Subject(s):  Tall buildings and towers. ,  Wind forces. ,  Return periods. ,  Gumbel distribution.

Project(s):  Long Term Prediction of Winds for Kuwait

Project code:  EC 032C

View document

Electric power system analysis development

1981

KISR Report

Final Report

Contributor(s):  Sartawi, M.

Subject(s):  Batch computer package for power. System analysis BACPA.

Project(s):  Technological progress and industrial productivity growth in Kuwait

Project code:  TE 38

View document

Battery plant marketing and production system. Phase l

1981

KISR Report

Final Report

Contributor(s):  Elimam, A. A.

Subject(s):  Battery. Marketing. Production system.

Project(s):  Battey plant visits for the period August 6, 1981-September 21, 1981

Project code:  TE 49 KISR

View document

An assessment of provate investment behavior in Kuwait

KISR Report

Progress Report

Contributor(s):  Al Jabsheh, F.

Subject(s):  Economic ,  Analysis ,  Foreign direct investment (FDI). ,  Long-run Economic Growth. ,  Diversification. ,  Econometric analysis. ,  الأستثمار الأجنبي المباشر ,  النمو الأقتصادي الطويل الأجل ,  التنوع ,  تحليل اقتصادي قياسي

Project(s):  An Assessment of Provate Investment Behavior in Kuwait

Project code:  TE 048C

View document

Battery plant marketing and production systems, Phase l, Annex lll, Technology assessment lead-acid battery design

1981

KISR Report

Final Report

Contributor(s):  Kharaishi, N. M.

Subject(s):  Lead-acid battery. Batteries. Local battery.

Project(s):  Battey Plant Marketing and Production Systems

Project code:  TE 49 KISR

View document

Battery plant marketing and production systems, Phase l, Annex IV, Technology assessmentprocess and equipment

1981

KISR Report

Final Report

Contributor(s):  Abdel-Latif, M. I.

Subject(s):  Technology assessment. Lead-acid battry. Battery design. Batteries. Local battery.

Project(s):  Battey Plant Marketing and Production Systems

Project code:  TE 49 KISR

View document

Financial analysis and assessment for the privatisation of the wastewater reclamation complex at Sulaibiya

2000

KISR Report

Technical Report No. 6

Contributor(s):  Odedokun, M. O.

Subject(s):  Treatment. ,  Advanced. ,  Conventional. ,  Reverse osmosis. ,  Coast. ,  Feasibility.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document

Wastewater reclamation, purification and reuse

1999

KISR Report

Technical Report

Contributor(s):  Chaudhuri, D.

Subject(s):  Wastewater treatment. ,  Disinfection technology. ,  Reverse osmosis.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document