عدد النتائج: 10091

Battery plant marketing and production systems, Phase l, Annex IV, Technology assessmentprocess and equipment

1981

KISR Report

Final Report

المساهمون:  Abdel-Latif, M. I.

الموضوعات:  Technology assessment. Lead-acid battry. Battery design. Batteries. Local battery.

المشروعات:  Battey Plant Marketing and Production Systems

رمز المشروع:  TE 49 KISR

عرض الملف

Financial analysis and assessment for the privatisation of the wastewater reclamation complex at Sulaibiya

2000

KISR Report

Technical Report No. 6

المساهمون:  Odedokun, M. O.

الموضوعات:  Treatment. ,  Advanced. ,  Conventional. ,  Reverse osmosis. ,  Coast. ,  Feasibility.

المشروعات:  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

رمز المشروع:  TE 018S

عرض الملف

Wastewater reclamation, purification and reuse

1999

KISR Report

Technical Report

المساهمون:  Chaudhuri, D.

الموضوعات:  Wastewater treatment. ,  Disinfection technology. ,  Reverse osmosis.

المشروعات:  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

رمز المشروع:  TE 018S

عرض الملف

Benchmarking Kuwait's manufacturing sector :

2006

KISR Report

Technical Report No. 1

المساهمون:  Al-Essa, G.

الموضوعات:  Industrial Benchmarks. ,  Manufacturing sector. ,  Industrial competitiveness.

المشروعات:  A Roadmap for Kuwait's industrial development

رمز المشروع:  Te 036C

عرض الملف

Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of the non-nationals by nationals in the private sector of Kuwait

2000

KISR Report

Proposal

المساهمون:  Chishti, S.

الموضوعات:  Labor market reforms. ,  Private sector.

المشروعات:  Availability of potential jobs, nature of mismatch and the extent of substitution possibilities of the non-nationals by nationals in the private sector of Kuwait

رمز المشروع:  TE 025C

عرض الملف

Questionnaires analysis system (annual KISR internal customer satisfaction survey and client satisfaction survey 2016)

2016

KISR Report

Technical Report

المساهمون:  Al Fulaij, S.

الموضوعات:  Questionnaires ,  Staff ,  Satisfaction ,  Customers ,  Survey. ,  Results. ,  Comparison. ,  الأستبيانات ,  النتائج ,  مقارنة

المشروعات:  Questionnaires analysis system (annual KISR internal customer satisfaction survey and client satisfaction survey

رمز المشروع:  TE 024G

عرض الملف

Review of international experience in industrial planning : a roadmap for Kuwait's industrial development

2007

KISR Report

Technical Report

المساهمون:  Ramadhan, Mohammad.

الموضوعات:  Manufacturing ,  Production ,  Social development ,  Investments ,  Industrial strategy. ,  Dynamic learning process. ,  الأسترتيجية الصناعية ,  عملية التعلم الديناميكي

المشروعات:  A Roadmap for Kuwait's industrial development

رمز المشروع:  TE 036C

عرض الملف

An Assessment of cost structure and efficiency of public schools in Kuwait

2008

KISR Report

Proposal

المساهمون:  Burney, Nadeem.

الموضوعات:  Schools ,  Public schools ,  public education ,  Production ,  Public education. ,  Economic efficiency. ,  Economies of scale and scope. ,  Kuwait. ,  التعليم العام ,  الطلب علي المدرسين ,  مرونة الإحلال ,  اقتصاديات الحجم

المشروعات:  An Assessment of cost structure and efficiency of public schools in Kuwait

رمز المشروع:  TE 029C

عرض الملف

Evaluation of radarsat synthetic aperture radar beam modes for characterizing desertification and coastal processes in Kuwait

2002

KISR Report

Final Report

المساهمون:  Kwarteng, A.Y.

الموضوعات:  Radarsat. ,  SAR. ,  Oil lakes. ,  Burgan oil field. ,  Image processing sand dunes.

المشروعات:  Evaluation of radarsat synthetic aperture radar beam modes for characterizing desertification and coastal processes in Kuwait

رمز المشروع:  VD 007K

عرض الملف

Current and Expected Impact of WTO Agreement on the Kuwaiti Banking Sector.

2002

KISR Report

Final Report

المساهمون:  Mahmood, Z.

الموضوعات:  Competitive pricing. ,  Banking merger. ,  Financial deepening.

المشروعات:  Current and Expected Impact of WTO Agreement on the Kuwaiti Banking Sector

رمز المشروع:  TE 026C

عرض الملف

Third shrimp and fin fisheries management workshop, fin fisheries session 4-5 December 1982 Vol.1

1984

KISR Report

Final Report

المساهمون:  Mathews, C. P.

الموضوعات:  Shrimp. Fin fish. Fisheries mangement. Stock assessment. Otolithes argenteus. Epinephelus tauvina. Lutjanus coccineus. Penaeus semisulcatus. M. affinis. Metapenaeus affinis. P. semisulcatus.

المشروعات:  Third Shrimp & Fin Fisheries Management Workshop

رمز المشروع:  MB 41

عرض الملف

Bot tender to build, operate and transfer a wastewater treatment and reclamation plant at Sulaibiya :

1999

KISR Report

Technical Report No. 2

المساهمون:  Mohammad, O. E.

الموضوعات:  Advanced treatment. ,  Purified water. ,  Utilization. ,  Legal and financial conditions. ,  Evaluation system.

المشروعات:  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

رمز المشروع:  TE 018S

عرض الملف