KDR

report(s) found: 10091

Assessment of the water rise problem at Al Qurain residential area

2011

KISR Report

Progress Report No. 3

Contributor(s):  Hadi, Khaled.

Subject(s):  Groundwater ,  Groundwater ,  Hydrogeology ,  Hydrogeology ,  Water well drilling ,  Water well drilling

Project(s):  Assessment of the Water Rise Problem at Al Qurain Residential Area

Project code:  WM 028C

View document

Assessment of volatile organic compounds removal in wastewater treatment plants

2020

KISR Report

Annual Progress Report No. 2

Contributor(s):  Al Matouq, A.

Subject(s):  Water ,  Water ,  Seawage ,  Seawage ,  Kabd wastewater treatment plant ,  Benzene ,  Cancer ,  Emissions ,  health risk ,  محطة كبد لمعالجة مياه الصرف ,  السرطان ,  الانبعاثات ,  المخاطر الصحية

Project(s):  Assessment of volatile organic compounds removal in wastewater treatment plants

Project code:  Wt 074K

View document

Pilot Scale Feasibility study of the recovery of water from unsaturated zone in Kuwait

2021

KISR Report

Proposal

Contributor(s):  Mukhopadhyay, Amitabha

Subject(s):  Water security ,  Water security ,  Climatic change ,  Climatic change ,  مياة غير تقليدية ,  الأمن المائي ,  الزراعة المستدامة ,  الزراعة الجافة ,  unconventional water ,  Water security ,  Sustainable agriculture ,  Arid agriculture

Project(s):  Pilot Scale Feasibility study of the recovery of water from unsaturated zone in Kuwait

Project code:  WM 071C

View document

Direct Upgrading Process Study for Kuwait Crude Oils (Phase II): Scale-Up Assessmet

2008

KISR Report

Final Report

Contributor(s):  Marafi, A.

Subject(s):  Kuwait heavy crude ,  Hydroprocessing of heavy crude ,  Desulfurization ,  Chemical process ,  Asphaltenes

Project(s):  Direct Upgrading Process Study for Kuwait Crude Oils

Project code:  PF 030C

View document

Water Quality Assessment of Kuwait Beaches near sewage outfalls

2021

KISR Report

Proposal

Contributor(s):  Bushaibah, O.

Subject(s):  Fresh water ,  Fresh water ,  Water quality ,  Water quality ,  Environmental pollution ,  Heavy metals ,  microbial ,  Nutrients ,  Pharmaceuticals ,  Public health ,  بيئي ,  معادن ميكروبية ,  المغذيات ,  الأدوية ,  الصحة العامة

Project(s):  Water Quality Assessment of Kuwait Beaches near sewage outfalls

Project code:  WT 085K

View document

Economic potential for commercializing KISR stabilizer in Kuwait and The GCC Countries

1989

KISR Report

Technical Report

Contributor(s):  Taha, M.

Subject(s):  Soil stabilizer. Capital investment cost. Production cost. Cost-effective. Comparative advantage.

Project(s):  Economic Potential for Commercializing KISR Stabilizer in Kuwait and the GCC Countries

Project code:  PRO 22

View document

Rubberized Asphalt pilot road

2021

KISR Report

Amendment "A"

Contributor(s):  Zoorob, S.

Subject(s):  Asphalt ,  Asphalt ,  Roads ,  Roads

Project(s):  Rubberized Asphalt pilot road

Project code:  EU 108C

View document

Condensation reactions of urea with aldehydes (controlled-release nitrogen fertilizers)

1983

KISR Report

Technical Report

Contributor(s):  Shuhaibar, K. F.

Subject(s):  Hydrolysis rate. Controlled-release nitrogen compound. Condensation reactions.

Project(s):  Condensation Reactions of Urea with Aldehydes (Controlled-Release Nitrogen Fertilizers)

Project code:  PRO GEN

View document

Evaluation of chemicals affecting asb/cem pipes using sem and x-ray diffraction. Task F5

1982

KISR Report

Interim Report No. 23.

Contributor(s):  Al-Deeb, A. M.

Subject(s):  Morphological study of asbestos/cement failed pipes.

Project(s):  Evaluation of Chemicals Affecting asb/cem Pipes Using Sem and X-ray Diffraction (Task F5)

Project code:  SPP 1

View document

Assessment of the Performance of the electric vehicle under extreme climate conditions and development of a framework for Kuwait city to be "Ev-Ready"

2020

KISR Report

Annual Progress Report No.1

Contributor(s):  Hamwi, H.

Subject(s):  Electric vehicles ,  Electric vehicles ,  Urban transportation ,  Urban transportation ,  Electric vehicle

Project(s):  Assessment of the Performance of the Electric Vehicle Under Extreme Climate Conditions and Development of a Framework for Kuwait City to be "Ev-Ready"

Project code:  EA 084C

View document

Asphaltene deposition and induced formation damage studies for Kuwaiti (W.K and sek) reservoirs

2006

KISR Report

Proposal

Contributor(s):  Oskui, R.P.

Subject(s):  PVT analysis. ,  Marrat field. ,  Asphaltene measurement. ,  Phase Behavior. ,  Reservoir fluids. ,  compositional analysis.

Project(s):  Asphaltene deposition and Induced Formation Damage Studies For Kuwaiti (W.K and SEK) Reserviors

Project code:  PP 031C

View document

Feasibility study for the Economic and reliability enhancement of the electric power system through co-optimization of energy and water desalination resources

2021

KISR Report

Final Report

Contributor(s):  Al Abdullah, Yousef

Subject(s):  Energy ,  Water desalination ,  Electricity ,  Water Quality ,  عمليات أنظمة الطاقة ,  إقتصاديات أنظمة الطاقة ,  موثوقية أنظمة الطاقة ,  تحسينات ,  Energy forecasting ,  Energy economics ,  power system operations ,  Power system planning ,  Water Desalination

Project(s):  Feasibility Study for the Economic & Reliability Enhancement of the Electric Power System through Co-Optimization of Energy & Water Desalination Resources

Project code:  EA 075C

View document