KDR

report(s) found: 10100

The arabic number race.

2014

KISR Report

Technical Report

Contributor(s):  Al Qallaf, Ali.

Subject(s):  Children ,  Learning ,  Numbers ,  Calculators ,  Childrens books ,  Learning disability. ,  Dyscalculia. ,  Arabic support. ,  Mathematical game. ,  Children. ,  صعوبات التعلم ,  خلل الحساب ,  دعم العربية ,  لعبة حسابية ,  اطفال

Project(s):  The Arabic Number Race

Project code:  SD 001G

View document

Proyecto para introduccion de tecnicas de marcado para camarones-terminal statement

1983

KISR Report

Final Report

Contributor(s):  Mathews, C. P.

Subject(s):  Shrimp stock assessment. Effort. Recruitment. Closed seasons.

Project(s):  Proyecto Para Introduccion de Tecnicas de Marcado Para Camarones-Terminal Statement

Project code:  RFS 43

View document

Behavior and fate of oil in the marine environment :

1988

KISR Report

Proposal

Contributor(s):  Literathy, P.

Subject(s):  Oil pollution. Marine environment. Physical processes. Biodegradation. Bio-transformation. Chemical oxidation. Photo-oxidation.

Project(s):  Behavior & Fate of Oil in the Marine Environment: Physical, Biological & Chemical Processes (State-of-the-Art)

Project code:  EES 122

View document

Design and installation of 1 kwp photovoltaic system for radiotelephone system

1989

KISR Report

Final Report

Contributor(s):  Al-Busairi, H.

Subject(s):  Remote sites powered by PV. PV-powered communications. Radiotelephone.

Project(s):  Design and Installation of 1 kW Photovoltaic System for Radiotelephone System

Project code:  RFS 224

View document

An investigation of the corrosion problems in the water network at the Dubaiya park

1983

KISR Report

Preproposal

Contributor(s):  Al-Borno, A.

Subject(s):  Corrosion. Water network. Dubaiya park.

Project(s):  An Investigation of the Corrosion Problems in the Water Network at the Dubaiya Park

Project code:  RFS 42

View document

Hydraulic studies and environmental impact assessment for Subiya power station. Appendix A, Baseline data for environmental impact assessment

1987

KISR Report

Interim Report

Contributor(s):  Abou-Seida, M. M.

Subject(s):  Baseline data. Marine environment. Atmospheric environment. Environmental regulations. Khor Al-Sabiya. Kuwait Bay.

Project(s):  Hydraulic Studies & Environmental Impact Assessment for Subiya Power Station

Project code:  EES 88

View document

Evaluation of dearborn polymate 947

1987

KISR Report

Final Report

Contributor(s):  Al-Borno, A.

Subject(s):  Corrosion inhibitors. Commercial corrosion inhibitor polymate 947.

Project(s):  Evaluation of Dearborn Polymate 947

Project code:  RFS 178

View document

Hydraulic studies and environmental impact assessment for Subiya power station. Vol. lX of Xl

1988

KISR Report

Final Report

Contributor(s):  Abou-Seida, M. M.

Subject(s):  Integrated environment assessment. Marine and atmospheric environment. Mitigation measures.

Project(s):  Hydraulic Studies & Environmental Impact Assessment for Subiya Power Station

Project code:  EES 88

View document

Assessment of technological capabilities in oil refining, petrochemical and fertilizer industries in Kuwait, including engineering design expertise

1985

KISR Report

Technical Report

Contributor(s):  Ismail, M. M.

Subject(s):  Technology transfer. Kuwait industry engineering capability. Oil refinery. Kuwait Petrochemical industry assessment. Kuwait fertilizer industry assessment. Kuwait.

Project(s):  Assessment of Technological Capabilities in Oil Refining, Petrochemical and Fertilizer Industries in Kuwait, Including Engineering Design Expertise

Project code:  RFS 112

View document

Hydraulic studies and environmental impact assessment for Subiya power station. Appendix B

1987

KISR Report

Interim Report

Contributor(s):  Abou-Seida, M. M.

Subject(s):  Baseline data. Marine environment. Atmospheric environment. Environmental regulations. Khor Al-Sabiya. Kuwait Bay.

Project(s):  Hydraulic Studies & Environmental Impact Assessment for Subiya Power Station

Project code:  EES 88

View document

Development of integrated complex using 100 KWE STC unit

1979

KISR Report

Proposal

Contributor(s):  Moustafa, S.

Subject(s):  Prototype integrated food/water/power complex. Solar thermal conversion.

Project(s):  Development of Integrated Complex using 100 KWE STC unit

Project code:  SE 5 KISR/

View document

Overview of the outlines of Sulaibiya wastewater treatment scheme :

1999

KISR Report

Technical Report No. 4

Contributor(s):  Abdel-Jawad, M.

Subject(s):  Financing. ,  Cost. ,  Flows. ,  Design characteristics. ,  Time schedule.

Project(s):  Technical and Financial Assessment for the Privatization of the Wastewater Reclamation Complex at Sulaibiya

Project code:  TE 018S

View document