KDR

report(s) found: 10091

Electricity demand in Kuwait:

2005

KISR Report

Technical Report No. 2

Contributor(s):  Awadh, Wafa.

Subject(s):  Electric power consumption ,  Electric power consumption ,  Energy development ,  Energy development ,  أنماط إستهلاك الكهرباء ,  العوامل السعرية وغير السعرية ,  Electricity consumption patterns. ,  Tariff/Non-tariff factors.

Project(s):  A Plan for Energy Conservation and Management of Electricity Demand for the State of Kuwait

Project code:  TE 035C

View document

Root cause failure analysis of leaked material S32154,

2009

KISR Report

Technical Report

Contributor(s):  Riad, W.

Subject(s):  Filler metal--catalog ,  Welded joints ,  Leaked piping system, repair welding, seawater, 254SMO ,  تسرب في نظام الأنابيب; تصليح اللحام;مياة البحر;254SMO

Project(s):  Root Cause Failure Analysis of Leaked Material S32154

Project code:  PF 018S

View document

Electricity demand in Kuwait:

2005

KISR Report

Technical Report No. 1

Contributor(s):  Al Enezi, Mahammed.

Subject(s):  Electricity power consumption ,  Electricity power consumption ,  Energy development ,  Energy development ,  Electricity consumption patterns. ,  Tariff/Non-tariff factors. ,  Demand management. ,  Projections. ,  أنماط إستهلاك الكهرباء ,  العوامل السعرية وغير السعرية ,  إدارة الطلب ,  تنبؤات مستقبلية

Project(s):  A Plan for Energy Conservation and Management of Electricity Demand for the State of Kuwait

Project code:  TE 035C

View document

Development of a process for the preparation of an active hydrodemetallization catalyst from spent catalysts

2003

KISR Report

Progress Report No. 1

Contributor(s):  Marafi, M.

Subject(s):  Spent catalyst utilization. ,  Hydrotreating catalyst preparation. ,  Alumina extrusion.

Project(s):  Development of a Process for the Preparation of an Active Hydrodemetalization Catalyst from Spent Catalyst

Project code:  PF 019C

View document

Evaluation of the hourly cost of electricity generation in Kuwait

1987

KISR Report

Final Report

Contributor(s):  Karaki, S.

Subject(s):  Water production. Production simulation. Dual purpose plants.

Project(s):  Evaluation of the Hourly Cost of Electricity Generation in Kuwait

Project code:  RFS 145

View document

A preliminary study of the effect of tar-epoxy paint on petroleum product quality

1987

KISR Report

Final Report

Contributor(s):  Marron, K.

Subject(s):  Tanker conversion. Tar-epoxy coatings. Reformate. Discolouration. ATK. Kerosene. Gas oil. Naphtha. Rubber. Deterioration. Tanker cleaning.

Project(s):  A Preliminary Study of the Effect of Tar-epoxy Paint on Petroleum Product Quality

Project code:  RFS 148

View document

Development of a process for the preparation of an active hydrodemetallization catalyst from spent catalysts

2003

KISR Report

Proposal

Contributor(s):  Marafi, M.

Subject(s):  Hydrotreating processes. ,  Catalyst preparation.

Project(s):  Development of a Process for the Preparation of an Active Hydrodemetalization Catalyst from Spent Catalysts

Project code:  PF 019C

View document

Small and medium enterprises in Kuwait : their impact and the way forward

2018

KISR Report

Final Report

Contributor(s):  Girgis, M.

Subject(s):  Economics growth ,  Economics growth ,  Economists ,  Economists

Project(s):  Small and medium enterprises in Kuwait : their impact and the way forward

Project code:  TE 051C

View document

Development of new technology for deep processing of petroleum residues

2002

KISR Report

Technical Report No. 1

Contributor(s):  Michael, G.

Subject(s):  Atmospheric residue. ,  Residue conversion. ,  Sulfur conversion. ,  Pilot plant. ,  Colloidal chemistry.

Project(s):  Development of New Technology for Deep Processing of Petroleum Residue

Project code:  PF 014C

View document

Battery plant marketing and production systems, Phase l, Annex V, Fundamentals of lead acid battery

1981

KISR Report

Final Report

Contributor(s):  Al-Mutari, A.

Subject(s):  Lead-acid battery. Batteries. Local battery.

Project(s):  Battey Plant Marketing and Production Systems

Project code:  TE 49 KISR

View document

An investigation of the corrosion problems associated with the galvanized steel water system for Messilah Beatch Hotel

1982

KISR Report

Technical Report

Contributor(s):  Islam, M.

Subject(s):  Corrosion. Galvanized steel water supply system. Pipe material.

Project(s):  An Investigation of the Corrosion Problems Associated with the Galvanized Steel Water System for Messilah Beatch Hotel

Project code:  RFS 16

View document

Forecasting demand for energy in Kuwait

1979

KISR Report

Final Report

Contributor(s):  Marzouk, M. S.

Subject(s):  Energy . Energy research.

Project(s):  Kuwaiti Manufactured Products' Penetration in the Eu Markets

Project code:  TE 39 KISR

View document