KDR

report(s) found: 10091

Nitrogen and Phosphorus Reduction/Removal from RO reject wastewater:

2010

KISR Report

Revised Final Report

Contributor(s):  Shahalam, Abu Al Bashar.

Subject(s):  Salinization ,  Waste water ,  Bench scale process. ,  Pilot-scale process. ,  Performance. ,  Nutrient reduction. ,  Brine-wastewater. ,  العمليه المخبريه. ,  العمليه النمطيه. ,  مستوي الأداء. ,  تناقص المغذيات. ,  مياه الصرف الصحي عالية الملوحه.

Project(s):  Nitrogen and Phosphorus Reduction/Removal from RO Reject Wastewater

Project code:  WT 018C

View document

Design of a short term brackish groundwater utilization scheme for the Northern oil fields

2013

KISR Report

Proposal

Contributor(s):  Al Senafy, Mohammad.

Subject(s):  Brackish water ,  Brackish water ,  Production. ,  Design. ,  Wells. ,  Salinity. ,  Pumping test. ,  Numerical model. ,  انتاج. ,  تصميم. ,  آبار. ,  ملوحة. ,  أختبارات الضخ. ,  نموذج عددى.

Project(s):  Design of a Short-term Brackish Groundwater Utilization Scheme for the Northern Oil Fields

Project code:  WM 049C

View document

Optimum utilization strategy for the fresh groundwater lenses at Al-Raudhatain field

2005

KISR Report

Progress Report No. 2

Contributor(s):  Al-Otaibi, M.

Subject(s):  Freshwater lenses. ,  Artificial recharge. ,  Groundwater management. ,  Geochemical modelling.

Project(s):  Optimum Utilization Strategy for the Fresh Groundwater Lenses at Raudhatain Field

Project code:  WM 017C

View document

Development of water code of practice for internal plumbing in Kuwait.

2007

KISR Report

Final Report

Contributor(s):  Azrag, E.

Subject(s):  Plumbing codes. ,  Potable-water. ,  UPC. ,  IAPMO.

Project(s):  Development of Water Code of Practice for Internal Plumbing in Kuwait

Project code:  WM 023C

View document

Assessment of electrical power generation and water desalination plants :

KISR Report

Final Report

Contributor(s):  El Sayed, Esam.

Subject(s):  Energy ,  Energy ,  Steam power plants ,  Steam power plants ,  محطات بخارية ,  تقطير فجائي متعدد المراحل ,  تقييم الأداء ,  الأداء الاقتصادي ,  مقارنة بمقاييس استرشادية ,  Steam plant. ,  Multistage flash. ,  Performance evaluation. ,  Economic performance. ,  Benchmarking.

Project(s):  Assessment of Electrical Power Generation and Water Desalination Plants

Project code:  WT 023C

View document

Preparation and characterization of polypropylene Nanocomposites and Nanomembranes reinforced with Halloysite nanotubes and Layered Silicates

2010

KISR Report

Progress Report No.1

Contributor(s):  Lahalih, Shawqi

Subject(s):  Nanocomposits ,  Nanocomposits ,  Polymerchemistry ,  Polymerchemistry ,  تكنولوجيا النانو ,  حبيبات النانو ,  خواص ,  مياة بحر ,  Nanotechnology. ,  Nano-siz-clay. ,  Properties. ,  Seawater.

Project(s):  Preparation and Characterization ofPolypropylene Nanocomposites and Nanomembranes Reinforced with Halloysite Nanohibes and Layered Silicates

Project code:  WT 024C

View document

Research and development on desalination by reverse osmosis, Summary

1996

KISR Report

Final Report (Summary)

Contributor(s):  Ebrahim, S.

Subject(s):  Chemicals. Seawater. Pretreatment. Disinfectant. Antiscalant. Flocculant. Coagulant. Membrane cleaning. Membran testing. Material testing. Corrosion. Hybrid system. System configuration. Scale-up. Computer program.

Project(s):  Research and Development on Desalination by Reverse Osmosis

Project code:  WD 002

View document

Investigations on the occurrence of hydrogen sulfide in the groundwater of Kuwait city/

2005

KISR Report

Final Report

Contributor(s):  Al-Haddad, A.

Subject(s):  Observation wells. ,  Aquifer. ,  Aquitard. ,  Dammam. ,  Formation. ,  Activated carbon. ,  Treatment technologies. ,  Biological treatment.

Project(s):  Investigation of the Hydrogen Sulfide in the Groundwater of Kuwait City

Project code:  WM 013C

View document

Study, design and construction supervision of a pilot groundwater drainage project

2000

KISR Report

Final Report

Subject(s):  Settlement. ,  Multipoint extensometer. ,  Precise levelling. ,  Crack monitoring. ,  Deformation analysis.

Project(s):  Study and Construction Supervision of a Pilot Groundwater Drainage Project

Project code:  WH 001

View document

Assessment of electrical power generation and water desalination plants,

KISR Report

Final Report

Contributor(s):  El Sayed, Essam.

Subject(s):  Multi-stage desalination plants ,  Multi-stage desalination plants ,  Steam power plants ,  Steam power plants ,  Performance Evaluation ,  Performance Evaluation ,  Benchmarking ,  Benchmarking ,  محطات بخارية ,  تقطير فجائي متعدد الراحل ,  تقييم الأداء ,  الأداء الأقتصادي ,  مقارنة بمقاييس استرشادية ,  Steam plant. ,  Multistage flash. ,  Performance evaluation. ,  Economic performance. ,  Benchmarking.

Project(s):  Assessment of Electrical Power Generation and Water Desalination Plants

Project code:  WT 023C

View document

A study on desalination options in Kuwait

2004

KISR Report

Final Report

Subject(s):  Distillation. ,  Membrane separation. ,  Hybridization. ,  Process Integration. ,  Seawater.

Project(s):  A Study on Desalination Options in Kuwait

Project code:  WT 011C

View document

Monitoring and assessment of the natural attenuation of Hydrocarbon pollution of fresh grounwater resources in Kuwait

2014

KISR Report

Progress Report No. 5

Contributor(s):  Mukhopadhyay, Amitabh.

Subject(s):  Pollutants ,  Pollutants ,  Groundwater ,  Groundwater ,  Grounwater. ,  Biodegradation. ,  Biogeochemical modeling. ,  Remediation. ,  مياه جوفية. ,  التحلل البيولوجى. ,  النمذجة البيولوجية الكيميائية. ,  معالجة.

Project(s):  Monitoring and Assessment of the Natural Attenuation of Hydrocarbon Pollution of Fresh Groundwater Resources in Kuwait

Project code:  WM 045C

View document