عدد النتائج: 10091

Soil survey and associated activities for the state of Kuwait

1998

KISR Report

Interim Report No. 3

الموضوعات:  Soil survey. ,  Kuwait. ,  Soil analysis. ,  GIS. ,  Soil laboratories.

المشروعات:  Soil Survey and Associated Activities for the State of Kuwait

رمز المشروع:  FA 006C

عرض الملف

Chemical and geochemical studies of the sand and clay in Kuwait for industrial utilization. Appendix F

1982

KISR Report

Final Report

المساهمون:  Abu-Eid, R. M.

الموضوعات:  Sand. Clay. Geochemistry. Fiber glass raw materials.

المشروعات:  Chemical and Geochemical Studies on the Sand and Clay in Kuwait for Industrial Utilization

رمز المشروع:  MS 9 KISR

عرض الملف

Soil survey and associated activities for the state of Kuwait

1998

KISR Report

Progress Report No. 3

الموضوعات:  Soil classification. ,  Soil laboratory analysis. ,  Wafra, Kuwait. ,  Abdali, Kuwait. ,  Shagaya, Kuwait.

المشروعات:  Soil Survey and Associated Activities for the State of Kuwait

رمز المشروع:  FA 006C (SPP-11)

عرض الملف

Technology assessment lead acid battery design

1981

KISR Report

Intrim Report

المساهمون:  Khraishi, N.

الموضوعات:  Sli lead acid battery. Battery container. Posts and connectors. Separators. Grid materials. Paste. Weight analysis. Electrochemistry.

المشروعات:  Battey plant visits for the period August 6, 1981-September 21, 1981

رمز المشروع:  TE 49

عرض الملف

Assessment of indoor organic pollutant levels in selected schools

2011

KISR Report

Progress Report No. 3

المساهمون:  Al Awadi, Layla.

الموضوعات:  Indoor air pollution ,  Air quality management ,  Climate Change ,  Indoor air pollution ,  Air quality management ,  Climate Change ,  Indoor air quality ,  questionnaire forms ,  VOCs ,  PAH ,  PBDEs ,  مركبات المثبطة للحريق ,  المركبات الاروماتية متعددة الحلقات ,  المركبات الهيدروكربونية المتطايرة ,  نموذج الاستبيان ,  جودة هواء داخلي

المشروعات:  Assessment of Indoor Organic Pollutant Levels in Selected Schools

رمز المشروع:  EC 045C

عرض الملف

Testing, evaluation, and post-certification activities for radionuclide station, RN-40, Kuwait City, Kuwait

2019

KISR Report

Technical Report

المساهمون:  Al Dabbous, A. N.

الموضوعات:  Nuclear power plant ,  Nuclear power plant ,  Maintenance and repair ,  Maintenance and repair ,  منظمة الحظر الشامل للتجارب النووية ,  رصد النويدات المشعة ,  الصيانة ,  Comprehensive nuclear test ban treaty organization ,  Continuous monitoring system ,  manitenence activities

المشروعات:  Testing, Evaluation, & Post-Certification Activities for Radionuclide Station, RN-40, Kuwait City, Kuwait

رمز المشروع:  EC 032S

عرض الملف

A Plan for energy conservation and management of electricity demand for the state of Kuwait.

2004

KISR Report

Final Report

المساهمون:  Al Enezi, Mahammed.

الموضوعات:  Electricity consumption patterns. ,  Tariff/Non-tariff factors. ,  Demand management. ,  Projections.

المشروعات:  A Plan for Energy Conservation and Management of Electricity Demand for the State of Kuwait

رمز المشروع:  TE 035C

عرض الملف

Long term prediction of winds for Kuwait.

2007

KISR Report

Final Report

المساهمون:  Neelamani, Subramaniam.

الموضوعات:  Tall buildings and towers. ,  Wind forces. ,  Return periods. ,  Gumbel distribution.

المشروعات:  Long Term Prediction of Winds for Kuwait

رمز المشروع:  EC 032C

عرض الملف

Electric power system analysis development

1981

KISR Report

Final Report

المساهمون:  Sartawi, M.

الموضوعات:  Batch computer package for power. System analysis BACPA.

المشروعات:  Technological progress and industrial productivity growth in Kuwait

رمز المشروع:  TE 38

عرض الملف

Battery plant marketing and production system. Phase l

1981

KISR Report

Final Report

المساهمون:  Elimam, A. A.

الموضوعات:  Battery. Marketing. Production system.

المشروعات:  Battey plant visits for the period August 6, 1981-September 21, 1981

رمز المشروع:  TE 49 KISR

عرض الملف

An assessment of provate investment behavior in Kuwait

KISR Report

Progress Report

المساهمون:  Al Jabsheh, F.

الموضوعات:  Economic ,  Analysis ,  Foreign direct investment (FDI). ,  Long-run Economic Growth. ,  Diversification. ,  Econometric analysis. ,  الأستثمار الأجنبي المباشر ,  النمو الأقتصادي الطويل الأجل ,  التنوع ,  تحليل اقتصادي قياسي

المشروعات:  An Assessment of Provate Investment Behavior in Kuwait

رمز المشروع:  TE 048C

عرض الملف

Battery plant marketing and production systems, Phase l, Annex lll, Technology assessment lead-acid battery design

1981

KISR Report

Final Report

المساهمون:  Kharaishi, N. M.

الموضوعات:  Lead-acid battery. Batteries. Local battery.

المشروعات:  Battey Plant Marketing and Production Systems

رمز المشروع:  TE 49 KISR

عرض الملف