عدد النتائج: 10100

Screening industrial effluents in Shuaiba Industrial Area for priority pollutants. Phase II

1985

KISR Report

Proposal

المساهمون:  Shunbo, F.

الموضوعات:  Industrial effluents. Priority pollutants. Gas high chromatography. High pressure liquid chromatography. Quality assurance.

المشروعات:  Screening Industrial Effluents in Shuaiba Industrial Area for Priority Pollutants

رمز المشروع:  RFP 113

عرض الملف

Technical manuals and standards for window design, orientation, shading, air infiltration and dust penetration

1986

KISR Report

Proposal

المساهمون:  Kellow, M.

الموضوعات:  Energy conservation in building. Fenestration. Shading design. Air infiltration. Dust penetration.

المشروعات:  Technical Manuals and Standards for Window Design, Orientation, Shading, air Infiltration and Dust Penetration

رمز المشروع:  RFP 111

عرض الملف

Hydraulic model for Al-Taweelah power plant project-Abu Dhabi

1985

KISR Report

Revised Proposal

المساهمون:  Lo, J. M.

الموضوعات:  Hydraulic model study.

المشروعات:  Hydraulic Model for Al-Taweelah Power Plant Project-Abu Dhabi

رمز المشروع:  RFP 102

عرض الملف

Demand for medical care in kuwait

2011

KISR Report

Progress Report No. 2

المساهمون:  Burney, Nadeem.

الموضوعات:  Healthcare ,  Health ,  Disease ,  Survey ,  Report ,  Morbidity. ,  Health. ,  Utilization. ,  demand. ,  Kuwait. ,  الأمراض السائدة; ,  الصحة ,  الأستخدام ,  الطلب ,  الكويت

المشروعات:  Demand for Medical Care in kuwait

رمز المشروع:  TE 013C

عرض الملف

Analysis of offshore wave records at Fintas and Failaka Island, Kuwait

1995

KISR Report

Proposal

المساهمون:  Marmoush, Y.

الموضوعات:  Wind. Waves. Statistical analysis. Database.

المشروعات:  Analysis of Offshore Wave Records at Fintas and Failaka Island, Kuwait

رمز المشروع:  VC 003k

عرض الملف

The multiple machine makespan problem :

1982

KISR Report

Technical Report

المساهمون:  Elimam, A. A.

الموضوعات:  Makespan. Scheduling. Branch and bound. Multiple machines.

المشروعات:  The Multiple Machine Makespan Problem :A Branch and Bound Approach

رمز المشروع:  TE GEN

عرض الملف

A market assessment of bilingual telex and word-processing equipment in the Arab World

1983

KISR Report

Technical Report

المساهمون:  Girgis, M.

الموضوعات:  Word processor. Telex machines. Market demand. Market share.

المشروعات:  A Market Assessment of Bilingual Telex & Word-Processing Equipment in the Arab World

رمز المشروع:  ED GEN

عرض الملف

Economics data banks (EDB). Phase l

1988

KISR Report

Final Report

المساهمون:  Salih, S. A.

الموضوعات:  Time-series. Updading the data base. Basic indicators. Charts and summary statistics.

المشروعات:  Economics Data Banks (EDB)

رمز المشروع:  ED 14

عرض الملف

Design of an energy-efficient and cool storage assisted air-conditioning system

1998

KISR Report

Technical Report

الموضوعات:  Energy conservation. ,  Energy simulation computer program.

المشروعات:  Design of an Energy-Efficient & cool Storage Assisted Air-Conditioning System

رمز المشروع:  EE 001G

عرض الملف

An update on the operation of the hot-box experimental facility for investigation the thermal performance of building components

1998

KISR Report

Technical Report

المساهمون:  Aasem, E.

الموضوعات:  Calibrated hot-box. ,  Dynamic thermal performance.

المشروعات:  An Update on the Operation of the Hot-Box Experimental Facility for Investigation the Thermal Performance of Building Components

رمز المشروع:  EE 002G

عرض الملف

Assessment of the status of the telecommunications systems in Kuwait. Phase 1

1988

KISR Report

Proposal

المساهمون:  Techno-Economics Division.

الموضوعات:  Information. Telecommunications system. Telecommunications in Kuwait.

المشروعات:  Assessment of the Status of the Telecommunications Systems in Kuwait

رمز المشروع:  ED 18

عرض الملف

Cost benefit analysis for energy efficient lighting

1997

KISR Report

Technical Report

المساهمون:  Al-Nakib, D.

الموضوعات:  Electric lighting. ,  Electric lamps. ,  Energy conservation ,  Light bulbs. ,  Lighting fixtures. Compact. Fluorescent bulbs. Enegy-efficiency.

المشروعات:  Cost Benefit Analysis for Energy Efficient Lighting

رمز المشروع:  EE 004s

عرض الملف