KDR

report(s) found: 10100

Screening industrial effluents in Shuaiba Industrial Area for priority pollutants. Phase II

1985

KISR Report

Proposal

Contributor(s):  Shunbo, F.

Subject(s):  Industrial effluents. Priority pollutants. Gas high chromatography. High pressure liquid chromatography. Quality assurance.

Project(s):  Screening Industrial Effluents in Shuaiba Industrial Area for Priority Pollutants

Project code:  RFP 113

View document

Technical manuals and standards for window design, orientation, shading, air infiltration and dust penetration

1986

KISR Report

Proposal

Contributor(s):  Kellow, M.

Subject(s):  Energy conservation in building. Fenestration. Shading design. Air infiltration. Dust penetration.

Project(s):  Technical Manuals and Standards for Window Design, Orientation, Shading, air Infiltration and Dust Penetration

Project code:  RFP 111

View document

Hydraulic model for Al-Taweelah power plant project-Abu Dhabi

1985

KISR Report

Revised Proposal

Contributor(s):  Lo, J. M.

Subject(s):  Hydraulic model study.

Project(s):  Hydraulic Model for Al-Taweelah Power Plant Project-Abu Dhabi

Project code:  RFP 102

View document

Demand for medical care in kuwait

2011

KISR Report

Progress Report No. 2

Contributor(s):  Burney, Nadeem.

Subject(s):  Healthcare ,  Health ,  Disease ,  Survey ,  Report ,  Morbidity. ,  Health. ,  Utilization. ,  demand. ,  Kuwait. ,  الأمراض السائدة; ,  الصحة ,  الأستخدام ,  الطلب ,  الكويت

Project(s):  Demand for Medical Care in kuwait

Project code:  TE 013C

View document

Analysis of offshore wave records at Fintas and Failaka Island, Kuwait

1995

KISR Report

Proposal

Contributor(s):  Marmoush, Y.

Subject(s):  Wind. Waves. Statistical analysis. Database.

Project(s):  Analysis of Offshore Wave Records at Fintas and Failaka Island, Kuwait

Project code:  VC 003k

View document

The multiple machine makespan problem :

1982

KISR Report

Technical Report

Contributor(s):  Elimam, A. A.

Subject(s):  Makespan. Scheduling. Branch and bound. Multiple machines.

Project(s):  The Multiple Machine Makespan Problem :A Branch and Bound Approach

Project code:  TE GEN

View document

A market assessment of bilingual telex and word-processing equipment in the Arab World

1983

KISR Report

Technical Report

Contributor(s):  Girgis, M.

Subject(s):  Word processor. Telex machines. Market demand. Market share.

Project(s):  A Market Assessment of Bilingual Telex & Word-Processing Equipment in the Arab World

Project code:  ED GEN

View document

Economics data banks (EDB). Phase l

1988

KISR Report

Final Report

Contributor(s):  Salih, S. A.

Subject(s):  Time-series. Updading the data base. Basic indicators. Charts and summary statistics.

Project(s):  Economics Data Banks (EDB)

Project code:  ED 14

View document

Design of an energy-efficient and cool storage assisted air-conditioning system

1998

KISR Report

Technical Report

Subject(s):  Energy conservation. ,  Energy simulation computer program.

Project(s):  Design of an Energy-Efficient & cool Storage Assisted Air-Conditioning System

Project code:  EE 001G

View document

An update on the operation of the hot-box experimental facility for investigation the thermal performance of building components

1998

KISR Report

Technical Report

Contributor(s):  Aasem, E.

Subject(s):  Calibrated hot-box. ,  Dynamic thermal performance.

Project(s):  An Update on the Operation of the Hot-Box Experimental Facility for Investigation the Thermal Performance of Building Components

Project code:  EE 002G

View document

Assessment of the status of the telecommunications systems in Kuwait. Phase 1

1988

KISR Report

Proposal

Contributor(s):  Techno-Economics Division.

Subject(s):  Information. Telecommunications system. Telecommunications in Kuwait.

Project(s):  Assessment of the Status of the Telecommunications Systems in Kuwait

Project code:  ED 18

View document

Cost benefit analysis for energy efficient lighting

1997

KISR Report

Technical Report

Contributor(s):  Al-Nakib, D.

Subject(s):  Electric lighting. ,  Electric lamps. ,  Energy conservation ,  Light bulbs. ,  Lighting fixtures. Compact. Fluorescent bulbs. Enegy-efficiency.

Project(s):  Cost Benefit Analysis for Energy Efficient Lighting

Project code:  EE 004s

View document