عدد النتائج: 10100

Time measurement in the NIC cement products plants :

1987

KISR Report

Technical Report

المساهمون:  Abu-Hijleh, E.

الموضوعات:  Standard time. Bottleneck. Working environment. Variabilities.

المشروعات:  Incentives & Productivity Enhancement Measure in the NIC Cement Products Plants

رمز المشروع:  ASD 4

عرض الملف

Incentives and productivity enhancement measures in the NIC cement product plants

1986

KISR Report

Amendment/Extension 'A'

المساهمون:  Elimam, A. A.

الموضوعات:  Productivity. Maintenance. Quality control. Turnover. Computers.

المشروعات:  Incentives & Productivity Enhancement Measure in the NIC Cement Products Plants

رمز المشروع:  ASD 4

عرض الملف

Incentives and productivity enhancement measures in the NIC cement product plants

1988

KISR Report

Final Report (Revised)

المساهمون:  Elimam, A. A.

الموضوعات:  Maintenance. Quality control. Manpower training. Productivity analysis.

المشروعات:  Incentives & Productivity Enhancement Measure in the NIC Cement Products Plants

رمز المشروع:  ASD 4

عرض الملف

A graphics display system for Kuwait Air Force direction finders

1990

KISR Report

Amendment/Extension 'A'

المساهمون:  Mohammed, O.

الموضوعات:  Direction finding. IBM3270. Computer-based graphics system. Air Force.

المشروعات:  A Graphics Display System for Kuwait Air Force Direction Finders

رمز المشروع:  ASD 15

عرض الملف

A graphics display system for Kuwait Air Force direction finders

1986

KISR Report

Proposal

المساهمون:  Jafar, F. A.

الموضوعات:  Direction finding. IBM3270. Computer-based graphics system. Air Force.

المشروعات:  A Graphics Display System for Kuwait Air Force Direction Finders

رمز المشروع:  ASD 15

عرض الملف

A feasibility study utilizing the Saudi Arabian satellite receiving earth station as GCC's central source for satellite data

1986

KISR Report

Proposal

المساهمون:  Asem, A.

الموضوعات:  Satellit earth station. Acquisition systems. Remote sensing processing. Remote sensing and GCC Countries.

المشروعات:  A Feasibility Study Utilizing the Saudi Arabian Satellite Receiving Earth Station as GCC's Central Source for Satellite Data

رمز المشروع:  ASD 14

عرض الملف

Manufacturing process parametrs at Arabian Light Metal Company

1989

KISR Report

Technical Report

المساهمون:  Al-Sukar, E.

الموضوعات:  Control parameters. Manufacturing stages. Production systems. Input and output.

المشروعات:  Performance Improvement of Aluminum Profiles, Doors & Windows in Kuwait

رمز المشروع:  ASD 12

عرض الملف

Adaptive controls of selected processes at KNPC :

1989

KISR Report

Amendment/Extension 'A'

المساهمون:  Kotob, S.

الموضوعات:  Adaptive control. Advanced control.

المشروعات:  Adaptive Controls of Selected Processes at KNPC

رمز المشروع:  ASD 18

عرض الملف

Investigation of the possible utilization of robotic system in central analytical laboratory

1988

KISR Report

Amendment/Extension 'A'

المساهمون:  Al-Ammar, J.

الموضوعات:  Robotic systems. Central analytical laboratory.

المشروعات:  Investigation of the Possible Utilization of Robotic System in KISR's Central Analytical Laboratory

رمز المشروع:  ASD 24

عرض الملف

Assessment of the quality control practices of the Arabian Light Metal Company. Task 1.2

1989

KISR Report

Technical Report No. 4

المساهمون:  Al-Sebaiee, A. M.

الموضوعات:  Aluminum anodization. Aluminum extrusion. Aluminum quality control. Aluminum quality assurance.

المشروعات:  Performance Improvement of Aluminum Profiles, Doors & Windows in Kuwait

رمز المشروع:  ASD 12

عرض الملف

Optimization of sewage collection network in Kuwait. Phase ll and lll

1987

KISR Report

Proposal

المساهمون:  Elimam, A. A.

الموضوعات:  Wastewater collection network. Mathematical programming. Optimization.

المشروعات:  Optimization of Sewer Networks Design in Kuwait: Phase II & III

رمز المشروع:  ASD 6

عرض الملف

Optimization of sewage collection network in Kuwait. Phase ll and lll

1986

KISR Report

Pre-Proposal

المساهمون:  Elimam, A. A.

الموضوعات:  Wastewater collection network. Mathematical programming. Optimization.

المشروعات:  Optimization of Sewer Networks Design in Kuwait: Phase II & III

رمز المشروع:  ASD 6

عرض الملف